29 July, day two on site.



Second frame standing and connecting girts bolted into place.

Second lot of girts bolted to frame #2 ready to receive frame #3.

Steel connection plate bolted to frame #3 on the ground.

Foot plates fitted.


OJW Team admiring their work.

Client quality control check


Eric and Vinnie



Knee braces.

Knee braces fitted.