All lose parts numbered and loaded onto the truck. |
Post and beam frame arrives at Peregrine, Monday morning 10 am. |
Off loading complete by lunch time. |
All systems go, frame assembly begins. |
First gable frame standing 4.30 pm. |
A mast was erected enabling us to pull up the first frame. Weighing approx 1.2 tonnes. |
The new structure begins to appear from the ruins. |