Post and Beam delivery to site Monday 28 July

All lose parts numbered and loaded onto the truck.


Post and beam frame arrives at Peregrine, Monday morning 10 am.
Off loading complete by lunch time.

All systems go, frame assembly begins.


First gable frame standing 4.30 pm.

A mast was erected enabling us to pull up the first frame.  Weighing approx 1.2 tonnes.


The new structure begins to appear from the ruins.