Sunday, 17 August 2014

Large glazed gable frame

The two end gable frames being assembled and all joints checked in the factory before leaving for site.

Dylan preparing the girts, slotting them ready to receive steel connection plates.


Even and Eric cutting all knee braces on the big Robinson band saw.


No comments:

Post a Comment